Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
Part Number | Minimum order quantity | Volume Discount | Shank Diameter d (mm) | Overall Length L (mm) | Processing Applications | #2 | #3 | #4 | #5 | #6 | #7 | 1D | 2D | 3D | 4D | F | FD | MAX | T | Use | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 8 Days | 3 | 40 | Boss Hole Drilling | 0.4 ~ 2 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 0.9 | 0.5 ~ 8 | - | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 8 Days | 3 | 40 | Boss Hole Drilling | 0.4 ~ 2 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 0.9 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Boss Hole Drilling | ||
1 | 8 Days | 4 | 50 | Boss Hole Drilling | 0.4 ~ 3 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 1.4 | 0.5 ~ 12 | - | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 8 Days | 4 | 50 | Boss Hole Drilling | 0.4 ~ 3 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 1.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Boss Hole Drilling | ||
1 | 7 Days | 6 | 60 | Boss Hole Drilling | 0.4 ~ 5 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 2.4 | 0.5 ~ 20 | - | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 7 Days | 6 | 60 | Boss Hole Drilling | 0.4 ~ 5 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 2.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Boss Hole Drilling | ||
1 | 7 Days | 8 | 60 | Boss Hole Drilling | 0.4 ~ 7 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 3.4 | 0.5 ~ 28 | - | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 7 Days | 8 | 60 | Boss Hole Drilling | 0.4 ~ 7 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 3.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Boss Hole Drilling | ||
1 | 7 Days | 10 | 80 | Boss Hole Drilling | 0.4 ~ 9 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 4.4 | 0.5 ~ 35 | - | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 7 Days | 10 | 80 | Boss Hole Drilling | 0.4 ~ 9 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 4.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Boss Hole Drilling | ||
1 | 7 Days | 12 | 80 | Boss Hole Drilling | 0.4 ~ 11 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 5.4 | 0.5 ~ 36 | - | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 7 Days | 12 | 80 | Boss Hole Drilling | 0.4 ~ 11 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 5.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Boss Hole Drilling | ||
1 | 7 Days | 16 | 100 | Boss Hole Drilling | 0.4 ~ 15 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 7.4 | 0.5 ~ 48 | - | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 7 Days | 16 | 100 | Boss Hole Drilling | 0.4 ~ 15 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 7.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Boss Hole Drilling | ||
1 | 8 Days | 3 | 60 | Boss Hole Drilling | - | 0.4 ~ 2 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 0.9 | 0.5 ~ 8 | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 8 Days | 3 | 60 | Boss Hole Drilling | - | 0.4 ~ 2 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 0.9 | - | - | - | - | - | F | - | MAX | T | For Boss Hole Drilling | ||
1 | 8 Days | 4 | 80 | Boss Hole Drilling | - | 0.4 ~ 3 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 1.4 | 0.5 ~ 12 | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 8 Days | 4 | 80 | Boss Hole Drilling | - | 0.4 ~ 3 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 1.4 | - | - | - | - | - | F | - | MAX | T | For Boss Hole Drilling | ||
1 | 7 Days | 6 | 90 | Boss Hole Drilling | - | 0.4 ~ 5 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 2.4 | 0.5 ~ 20 | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 7 Days | 6 | 90 | Boss Hole Drilling | - | 0.4 ~ 5 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 2.4 | - | - | - | - | - | F | - | MAX | T | For Boss Hole Drilling | ||
1 | 7 Days | 8 | 90 | Boss Hole Drilling | - | 0.4 ~ 7 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 3.4 | 0.5 ~ 28 | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 7 Days | 8 | 90 | Boss Hole Drilling | - | 0.4 ~ 7 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 3.4 | - | - | - | - | - | F | - | MAX | T | For Boss Hole Drilling | ||
1 | 7 Days | 10 | 120 | Boss Hole Drilling | - | 0.4 ~ 9 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 4.4 | 0.5 ~ 35 | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 7 Days | 10 | 120 | Boss Hole Drilling | - | 0.4 ~ 9 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 4.4 | - | - | - | - | - | F | - | MAX | T | For Boss Hole Drilling | ||
1 | 7 Days | 12 | 120 | Boss Hole Drilling | - | 0.4 ~ 11 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 5.4 | 0.5 ~ 36 | - | - | - | - | F | - | - | T | For Boss Hole Drilling | ||
1 | 7 Days | 12 | 120 | Boss Hole Drilling | - | 0.4 ~ 11 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 5.4 | - | - | - | - | - | F | - | MAX | T | For Boss Hole Drilling | ||
1 | 8 Days | 3 | 60 | Flank / Groove Processing | - | 0.4 ~ 2 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 0.9 | 0.5 ~ 8 | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 8 Days | 3 | 60 | Flank / Groove Processing | - | 0.4 ~ 2 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 0.9 | - | - | - | - | - | F | - | MAX | T | For Radial Groove Milling | ||
1 | 8 Days | 4 | 80 | Flank / Groove Processing | - | 0.4 ~ 3 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 1.4 | 0.5 ~ 12 | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 8 Days | 4 | 80 | Flank / Groove Processing | - | 0.4 ~ 3 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 1.4 | - | - | - | - | - | F | - | MAX | T | For Radial Groove Milling | ||
1 | 7 Days | 6 | 90 | Flank / Groove Processing | - | 0.4 ~ 5 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 2.4 | 0.5 ~ 20 | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 7 Days | 6 | 90 | Flank / Groove Processing | - | 0.4 ~ 5 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 2.4 | - | - | - | - | - | F | - | MAX | T | For Radial Groove Milling | ||
1 | 7 Days | 8 | 90 | Flank / Groove Processing | - | 0.4 ~ 7 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 3.4 | 0.5 ~ 28 | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 7 Days | 8 | 90 | Flank / Groove Processing | - | 0.4 ~ 7 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 3.4 | - | - | - | - | - | F | - | MAX | T | For Radial Groove Milling | ||
1 | 7 Days | 10 | 120 | Flank / Groove Processing | - | 0.4 ~ 9 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 4.4 | 0.5 ~ 35 | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 7 Days | 10 | 120 | Flank / Groove Processing | - | 0.4 ~ 9 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 4.4 | - | - | - | - | - | F | - | MAX | T | For Radial Groove Milling | ||
1 | 7 Days | 12 | 120 | Flank / Groove Processing | - | 0.4 ~ 11 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 5.4 | 0.5 ~ 35 | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 7 Days | 12 | 120 | Flank / Groove Processing | - | 0.4 ~ 11 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 5.4 | - | - | - | - | - | F | - | MAX | T | For Radial Groove Milling | ||
1 | 8 Days | 3 | 40 | Flank / Groove Processing | 0.4 ~ 2 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 0.9 | 0.5 ~ 8 | - | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 8 Days | 3 | 40 | Flank / Groove Processing | 0.4 ~ 2 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 0.9 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Radial Groove Milling | ||
1 | 8 Days | 4 | 50 | Flank / Groove Processing | 0.4 ~ 3 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 1.4 | 0.5 ~ 12 | - | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 8 Days | 4 | 50 | Flank / Groove Processing | 0.4 ~ 3 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 1.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Radial Groove Milling | ||
1 | 7 Days | 6 | 60 | Flank / Groove Processing | 0.4 ~ 5 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 2.4 | 0.5 ~ 20 | - | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 7 Days | 6 | 60 | Flank / Groove Processing | 0.4 ~ 5 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 2.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Radial Groove Milling | ||
1 | 7 Days | 8 | 60 | Flank / Groove Processing | 0.4 ~ 7 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 3.4 | 0.5 ~ 28 | - | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 7 Days | 8 | 60 | Flank / Groove Processing | 0.4 ~ 7 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 3.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Radial Groove Milling | ||
1 | 7 Days | 10 | 80 | Flank / Groove Processing | 0.4 ~ 9 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 4.4 | 0.5 ~ 35 | - | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 7 Days | 10 | 80 | Flank / Groove Processing | 0.4 ~ 9 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 4.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Radial Groove Milling | ||
1 | 7 Days | 12 | 80 | Flank / Groove Processing | 0.4 ~ 11 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 5.4 | 0.5 ~ 36 | - | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 7 Days | 12 | 80 | Flank / Groove Processing | 0.4 ~ 11 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 5.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Radial Groove Milling | ||
1 | 7 Days | 16 | 100 | Flank / Groove Processing | 0.4 ~ 15 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 7.4 | 0.5 ~ 48 | - | - | - | - | - | F | - | - | T | For Radial Groove Milling | ||
1 | 7 Days | 16 | 100 | Flank / Groove Processing | 0.4 ~ 15 | 0 ~ 30 | 0 ~ 59 | 0.1 ~ 7.4 | - | - | 1 | 2 | 3 | 4 | F | FD | MAX | T | For Radial Groove Milling |
Loading...
Model Number | Blade Diameter D 0.005 mm Unit Specification | Single Corner θ °−min 1' Unit Specification | Corner C 0.01mm Unit Specification | Blade Length* ℓ 0.5 mm Unit Specification | Bottom Blade Shape (Selection) | Overall Length L | |||
Shank diameter d | |||||||||
Specified Range | ℓmax. | BSTCC | LS−BSTCC | ||||||
BSTCC LS−BSTCC (Long Shank) | 3 | 0.400 to 2.000 | 0°15' to 30°0' | 0.10 ≤ C ≤ (D−0.2)/2 | (1) 0.5 ≤ ℓ ≤ D×4 and (2) ℓ ≤ ℓmax. (See table at right) and (3) | 8.0 | T (Indented Center) F (Flat) | 40 | 60 |
4 | 0.400 to 3.000 | 12.0 | 50 | 80 | |||||
6 | 0.400 to 5.000 | 20.0 | 60 | 90 | |||||
8 | 0.400 to 7.000 | 28.0 | 60 | 90 | |||||
10 | 0.400 to 9.000 | 35.0 | 80 | 120 | |||||
12 | 0.400 to 11.000 | 36.0 | 80 | 120 | |||||
16 | 0.400 to 15.000 | 48.0 | 100 | − |
Model Number | Blade Diameter D 0.01mm Unit Specification | Single Corner θ °−min 1' Unit Specification | Corner C 0.01mm Unit Specification | Blade Length* ℓ 0.5 mm Unit Specification | Bottom Blade Shape (Selection) | Overall Length L | |||
Shank diameter d | |||||||||
Specified Range | ℓmax. | STCEM | LS−STCEM | ||||||
STCEM LS−STCEM (Long Shank) | 3 | 0.40 to 2.00 | 0°15' to 30°0' | 0.10 ≤ C ≤ (D−0.2)/2 | (1) 0.5 ≤ ℓ ≤ D×4 and (2) ℓ ≤ ℓmax. (See table at right) and (3) | 8.0 | T (Indented Center) F (Flat) | 40 | 60 |
4 | 0.40 to 3.00 | 12.0 | 50 | 80 | |||||
6 | 0.40 to 5.00 | 20.0 | 60 | 90 | |||||
8 | 0.40 to 7.00 | 28.0 | 60 | 90 | |||||
10 | 0.40 to 9.00 | 35.0 | 80 | 120 | |||||
12 | 0.40 to 11.00 | 36.0 | 80 | 120 | |||||
16 | 0.40 to 15.00 | 48.0 | 100 | − |
*Specify ℓ so that it meets all the conditions of (1), (2) and (3).
*Depending on the size of ℓ, all slope angles may be the blade length.
● BSTCC/LS−BSTCC
Click here for the cutting conditions (Cutting by end mill for carbide straight edge boss machining)
● STCEM/LS−STCEM
Click here for cutting conditions (groove cutting with customized straight blade end mill)
Material | Ultrafine Particulate Carbide |
---|
Configure
Basic Attributes
Shank Diameter d(mm)
Overall Length L(mm)
Processing Applications
#2
#3
#4
#5
#6
#7
1D
2D
3D
4D
F
FD
MAX
T
Type
Filter by standard shipping days
Optional Attributes