Manufacturer part number: G-FF-T20
Brand: ONDA MFG
Price: 29.55 €
Delivery time: 9 Days
Supply Side, Nominal Designation of Piping Thread Denomination B(Denomination A): 3/4B(20A)
Control Side Naminal Pipe Threads B name (A name): 3/4B(20A)
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
G-FF-T20
Part Number
|
---|
G-FF-T20 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | Supply Side, Nominal Designation of Piping Thread Denomination B(Denomination A) | Control Side Naminal Pipe Threads B name (A name) | |
---|---|---|---|---|---|---|
29.55 € | 1 | Available | 9 Days | 3/4B(20A) | 3/4B(20A) |
Loading...
Main Body Shape | Straight | Body Material | EN CW617N Equiv. / EN CW614N Equiv. | Applicable Fluid | Water / Air / Oil |
---|---|---|---|---|---|
Ball Valve Type | Full Bore | Supply Side, Connection Type | Rc Screws | Control Side, Connection Type | Rc Screws |
Handle Shape | T Handle | Operation Method | Manual Operation Type | Max Operating Pressure(MPa) | 2.8 |
Use of Antifreeze | Applicable | Valve Supply Side / Control Side Swapping | Applicable | Number of Sales Unit | 1 |
This page is Ball Valve, FF (Full-bore), Green T Handle, part number G-FF-T20.
You can find the detail information about specifications and dimensions on part number G-FF-T20.
Configure
Basic Attributes
Type
Supply Side, Nominal Designation of Piping Thread Denomination B(Denomination A)
Control Side Naminal Pipe Threads B name (A name)
Filter by CAD data type
Filter by standard shipping days
Optional Attributes
Part Number |
---|
G-FF-T08 |
G-FF-T10 |
G-FF-T25 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | Supply Side, Nominal Designation of Piping Thread Denomination B(Denomination A) | Control Side Naminal Pipe Threads B name (A name) |
---|---|---|---|---|---|---|
19.61 € | 1 | 9 Days | 1/4B(8A) | 1/4B(8A) | ||
21.99 € | 1 | Available | 9 Days | 3/8B(10A) | 3/8B(10A) | |
40.20 € | 1 | 9 Days | 1B(25A) | 1B(25A) |