Shipping Days |
- All
- Same day
- 1 Day or Less
- 2 Days or Less
- 3 Days or Less
- 4 Days or Less
- 5 Days or Less
- 6 Days or Less
- 7 Days or Less
- 8 Days or Less
- 9 Days or Less
|
?* Information on days to ship and prices
-
MAKITECH
[Features]
· Use at the intersection of conveyor lines, when changing the direction of goods to be conveyed on the line, or to flow on other lines.
· Load capacity: 20 kg.
Starting from∗ : |
7.33 €
|
Min. Shipping Days : |
6 Days
|
*Unit price with basic configuration
-
MAKITECH
[Features]
· Use at the intersection of conveyor lines, when changing the direction of goods to be conveyed on the line, or to flow on other lines.
· Load capacity: 25 kg.
Starting from∗ : |
9.68 €
|
Min. Shipping Days : |
10 Days
|
*Unit price with basic configuration
|
---|
Brand |
---|
Product Series |
---|
Starting from∗ |
---|
Min. Shipping Days : |
---|
Type
|
---|
Shape
|
---|
Load Capacity Range(N)
|
---|
Allowable Load(N)
|
---|
Body Material
|
---|
Ball Material
|
---|
O.D. D(Ø)
|
---|
Loading...
Narrow search by specifying spec./dim.
-
Type
-
Standard
-
Spring-Loaded
-
Garbage Discharge
-
Pneumatically Driven
-
Others
-
Related Part
-
Shape
-
Hex Screws
-
Round Shape Threaded
-
Cylindrical
-
Flange
-
Set Screws
-
Unit
-
Table
-
Others
-
Load Capacity Range(N)
- 1.0 to 10.0
- 5,000.1 to 10,000
- 10,000.1 to 20,000
- 10.1 to 20.0
- 20.1 to 50.0
- 50.1 to 100.0
- 100.1 to 500.0
- 500.1 to 5000
- 20000.1 or More
-
Allowable Load(N)
-
Body Material
-
Steel
-
Stainless Steel
-
Resin
-
Aluminum
-
Ball Material
-
Steel
-
Stainless Steel
-
Resin
-
O.D. D(Ø)
Narrow search by specifying Brand
-
- Cost Efficient Products ()
-
FREE BEAR (27)
-
IGUCHI KIKO (18)
-
ATEC (12)
-
BS ROLLEN (7)
-
TRUSCO NAKAYAMA (5)
-
TAKIGEN (3)
-
MAKITECH (2)
-
HALDER (2)
-
KIPP (0)
-
NORELEM (0)
-
FUJI SEISAKUSHO (0)
-
BOSCH REXROTH (0)
-
GANTER (0)
-
ELESA (0)
-
TORWEGGE (0)
-
MAEDLER (0)
Narrow search by specifying CAD data type