?* Information on days to ship and prices
YUKI LABORATORY
Starting from∗ : | 0.81 € |
---|---|
Min. Shipping Days : | 5 Days |
*Unit price with basic configuration
YUKI LABORATORY
Starting from∗ : | 0.56 € |
---|---|
Min. Shipping Days : | 5 Days |
*Unit price with basic configuration
YUKI LABORATORY
Starting from∗ : | 0.55 € |
---|---|
Min. Shipping Days : | 5 Days |
*Unit price with basic configuration
Brand |
---|
Product Series |
CAD |
Starting from∗ |
Min. Shipping Days : |
Nut Type |
Series Name |
Thread Nominal M(mm) |
Function |
Material |
Loosening Prevention |
Brand | YUKI LABORATORY | YUKI LABORATORY | YUKI LABORATORY |
---|---|---|---|
Product Series | |||
CAD |
|
|
|
Starting from∗ | 0.81 € *Unit price with basic configuration Volume Discount | 0.56 € *Unit price with basic configuration | 0.55 € *Unit price with basic configuration Volume Discount |
Min. Shipping Days : | 5 Days | 5 Days | 5 Days |
Nut Type | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts |
Series Name | LECOFRAME 40 Series (For Medium/Heavy Structures) | LECOFRAME 25 Series (For Light/Medium Structures) | LECOFRAME 40 Series (For Medium/Heavy Structures) |
Thread Nominal M(mm) | M3 | M3 | M3 |
Function | Standard | Standard | Standard |
Material | Aluminum | Steel | Aluminum |
Loosening Prevention | Not Provided | Not Provided | Not Provided |
Loading...