Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | Main fit tube(or application tube)outside diameter (mm) | Material | Applicable Pipe Type | Surface Treatment | The size of diameter of steel pipe (A) | Nominal Diameter (B) | Compatible Pipe Outer Diameter (mm) | |
---|---|---|---|---|---|---|---|---|---|---|---|
7.44 € | 1 | Available | 9 Days | 20~Less than 30 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | 15A | 1/2 | 21.7 | |
6.22 € | 1 | 8 Days | 20~Less than 30 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | 20A | 3/4 | 27.2 | ||
7.47 € | 1 | 8 Days | 30~Less than 40 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | 25A | 1 | 34 | ||
8.05 € | 1 | 6 Days | 40~Less than 50 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | 32A | 1 1/4 | 42.7 | ||
8.89 € | 1 | 6 Days | 40~Less than 50 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | 40A | 1 1/2 | 48.6 | ||
10.07 € | 1 | 8 Days | 60~Less than 70 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | 50A | 2 | 60.5 | ||
9.86 € | 1 | 8 Days | 70~Less than 80 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | 65A | 2 1/2 | 76.3 | ||
9.44 € | 1 | Available | 6 Days | 80~Less than 90 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | 80A | 3 | 89.1 | |
11.61 € | 1 | Available | 6 Days | 100~Less than 200 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | 100A | 4 | 114.3 | |
24.48 € | 1 | Available | 6 Days | 100~Less than 200 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | 125A | 5 | 139.8 | |
24.79 € | 1 | Available | 6 Days | 100~Less than 200 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | 150A | 6 | 165.2 | |
16.54 € | 1 | 9 Days | 20~Less than 30 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Hot Zinc Plating | 15A | 1/2 | 21.7 | ||
16.54 € | 1 | 9 Days | 20~Less than 30 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Hot Zinc Plating | 20A | 3/4 | 27.2 | ||
17.90 € | 1 | 9 Days | 30~Less than 40 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Hot Zinc Plating | 25A | 1 | 34 | ||
20.07 € | 1 | 8 Days | 40~Less than 50 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Hot Zinc Plating | 32A | 1 1/4 | 42.7 | ||
22.88 € | 1 | 9 Days | 40~Less than 50 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Hot Zinc Plating | 40A | 1 1/2 | 48.6 | ||
27.55 € | 1 | 8 Days | 60~Less than 70 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Hot Zinc Plating | 50A | 2 | 60.5 | ||
28.24 € | 1 | 9 Days | 70~Less than 80 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Hot Zinc Plating | 65A | 2 1/2 | 76.3 | ||
32.99 € | 1 | 8 Days | 80~Less than 90 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Hot Zinc Plating | 80A | 3 | 89.1 | ||
35.33 € | 1 | 8 Days | 100~Less than 200 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Hot Zinc Plating | 100A | 4 | 114.3 | ||
65.20 € | 1 | 7 Days | 100~Less than 200 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Hot Zinc Plating | 150A | 6 | 165.2 |
Loading...
Type | U Band | Number Contained In A Packet(piece) | 1 |
---|
Configure
Basic Attributes
Main fit tube(or application tube)outside diameter(mm)
Material
Applicable Pipe Type
The size of diameter of steel pipe (A)
Nominal Diameter (B)
Compatible Pipe Outer Diameter(mm)
Type
Surface Treatment
Filter by standard shipping days
Optional Attributes