Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
BBS-216-10RC
Part Number
|
---|
BBS-216-10RC |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | Supply Side, Plumbing Thread Nominal | Control Side, Plumbing Thread Nominal | L (mm) | (H) (mm) | (L1)(L2)(L3) (Ø) | |
---|---|---|---|---|---|---|---|---|---|
26.64 € | 1 | 10 Days | 3/8B(10A) | 3/8B(10A) | 44.5 | 40 | 80 |
Loading...
Main Body Shape | Straight | Body Material | EN CW617N Equiv. | Fluid | Vapor |
---|---|---|---|---|---|
Ball Valve Type | Reduced Bore | Supply Side, Connection Type | Rc | Control Side, Connection Type | Rc |
Handle Shape | Lever Handle Type | Body Lining | NA | Operating Temperature(℃) | -10::180 |
Operating Pressure Range(MPa) | ::0.98 | Operation Method | Manual Operation Type | Material and Color of Handle | Stainless Steel (EN 1.4016 Equiv.) (Dark Blue Plastic Coating) |
This page is Brass Ball Valve BBS Series for Low-Pressure Steam, part number BBS-216-10RC.
You can find the detail information about specifications and dimensions on part number BBS-216-10RC.
Configure
Basic Attributes
Control Side, Plumbing Thread Nominal
Type
Supply Side, Plumbing Thread Nominal
Filter by CAD data type
Filter by standard shipping days
Optional Attributes
Part Number |
---|
BBS-216-08RC |
BBS-216-15RC |
BBS-216-20RC |
BBS-216-25RC |
BBS-609-32RC |
BBS-609-40RC |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | Supply Side, Plumbing Thread Nominal | Control Side, Plumbing Thread Nominal | L (mm) | (H) (mm) | (L1)(L2)(L3) (Ø) |
---|---|---|---|---|---|---|---|---|---|
23.58 € | 1 | 5 Days | 1/4B(8A) | 1/4B(8A) | 40 | 31 | 60 | ||
31.08 € | 1 | 10 Days | 1/2B(15A) | 1/2B(15A) | 54.5 | 42 | 80 | ||
41.15 € | 1 | 10 Days | 3/4B(20A) | 3/4B(20A) | 61 | 51 | 100 | ||
59.71 € | 1 | 10 Days | 1B(25A) | 1B(25A) | 75 | 55 | 100 | ||
94.41 € | 1 | 10 Days | 1 1/4B(32A) | 1 1/4B(32A) | 80 | 66 | 150 | ||
115.87 € | 1 | 10 Days | 1 1/2B(40A) | 1 1/2B(40A) | 84 | 69 | 150 |