Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
CSPPNHNDBP2-STU-TPT2-8
Part Number
|
---|
CSPPNHNDBP2-STU-TPT2-8 |
Part Number |
Standard Unit Price
| Number of pc(s). included in pkg. | Minimum order quantity | Volume Discount | RoHS | Screw Nominal (M) | Length L (mm) | Surface Treatment | |
---|---|---|---|---|---|---|---|---|---|
132.55 € | 5,000 Pieces Per Package | 1 pack | 15 Days | - | 2 | 8 | [Bright Chrome Plating] Bright Chromate Plating |
Loading...
Detailed Shape | Pan | Material | Steel | Mounting Hole Shape | Phillips Head |
---|---|---|---|---|---|
Tip Shape | Flat End | Additional Shape | Washer Included | Thread Type | Tap-Tight |
Basic Shape | Standard (Round) | Sales Unit | Box/Package |
This page is Tap-Tight B Type Pan Screw P=2 (SW), part number CSPPNHNDBP2-STU-TPT2-8.
You can find the detail information about specifications and dimensions on part number CSPPNHNDBP2-STU-TPT2-8.
Configure
Basic Attributes
Surface Treatment
Type
Screw Nominal (M)
Length L (mm)
Filter by standard shipping days
Optional Attributes
Part Number |
---|
CSPPNHNDBP2-ST3B-TPT2-8 |
CSPPNHNDBP2-ST3B-TPT2.6-10 |
CSPPNHNDBP2-ST3B-TPT2.6-12 |
CSPPNHNDBP2-STU-TPT2.6-12 |
CSPPNHNDBP2-STU-TPT2.6-8 |
CSPPNHNDBP2-STU-TPT3-10 |
Part Number | Standard Unit Price | Number of pc(s). included in pkg. | Minimum order quantity | Volume Discount | Standard Shipping Days ? | RoHS | Screw Nominal (M) | Length L (mm) | Surface Treatment |
---|---|---|---|---|---|---|---|---|---|
219.34 € | 5,000 Pieces Per Package | 1 pack | 15 Days | 10 | 2 | 8 | [Trivalent Chromate] Trivalent Black | ||
123.26 € | 2,500 Pieces Per Package | 1 pack | 6 Days | 10 | 2.6 | 10 | [Trivalent Chromate] Trivalent Black | ||
107.56 € | 2,000 Pieces Per Package | 1 pack | 15 Days | 10 | 2.6 | 12 | [Trivalent Chromate] Trivalent Black | ||
95.80 € | 2,000 Pieces Per Package | 1 pack | 15 Days | - | 2.6 | 12 | [Bright Chrome Plating] Bright Chromate Plating | ||
107.21 € | 3,000 Pieces Per Package | 1 pack | 15 Days | - | 2.6 | 8 | [Bright Chrome Plating] Bright Chromate Plating | ||
81.37 € | 1,800 Pieces Per Package | 1 pack | 15 Days | - | 3 | 10 | [Bright Chrome Plating] Bright Chromate Plating |