Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
FD-L-200A-EPDM
Type | Clamp for Repair | Applicable Fluids | Water | Rubber Sealing Material | EPDM |
---|---|---|---|---|---|
Main Body Material | Stainless Steel | Tightening Bolt Type | Hexagon Socket Head Bolt |
This page is ATOMS CORPORATION FD-L Type Couplings for Repairs, part number FD-L-200A-EPDM.
You can find the detail information about specifications and dimensions on part number FD-L-200A-EPDM.
Configure
Basic Attributes
Applicable Pipe
Type
Nominal Diameter (A)
Filter by standard shipping days
Optional Attributes
Part Number |
---|
FD-L-125A-EPDM |
FD-L-150A-EPDM |
FD-L-15A-EPDM |
FD-L-20A-EPDM |
FD-L-250A-EPDM |
FD-L-25A-EPDM |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | Applicable Pipe | Nominal Diameter (A) |
---|---|---|---|---|---|---|
346.07 € | 1 | 10 Days | Carbon steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | 5B(125A) | ||
422.98 € | 1 | 10 Days | Carbon steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | 6B(150A) | ||
103.56 € | 1 | 10 Days | Carbon steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | 1/2B(15A) | ||
103.56 € | 1 | 10 Days | Carbon steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | 3/4B(20A) | ||
839.92 € | 1 | 10 Days | Carbon steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | 10B(250A) | ||
104.56 € | 1 | 10 Days | Carbon steel Pipes / Stainless Steel Pipe | 1B(25A) |