Manufacturer part number: HDISLT020O
Brand: YAMAWA MFG
Price: 221.06 €
Delivery time: 8 Days
Nominal: M20
Pitch, Number of Threading: 1.5 mm
Overall Length (L): 105 mm
Class: P5
Thread Length: 37 mm
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
HDISLT020O
Part Number
|
---|
HDISLT020O |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | Nominal | Pitch, Number of Threading (mm) | Overall Length (L) (mm) | Class | Thread Length (mm) | Length under neck (mm) | Shank diameter (Ds) (mm) | Number of Grooves | Shape | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
221.06 € | 1 | 8 Days | M20 | 1.5 | 105 | P5 | 37 | - | 16 | 4 | m |
Loading...
This page is HF Spiral Tap for Through Holes Used in Series Dry Machining of Carbon / Alloy Steel HDISL, part number HDISLT020O.
You can find the detail information about specifications and dimensions on part number HDISLT020O.
Configure
Basic Attributes
Length under neck(mm)
Type
Nominal
Pitch, Number of Threading(mm)
Overall Length (L)(mm)
Class
Thread Length(mm)
Shank diameter (Ds)(mm)
Number of Grooves
Shape
Filter by standard shipping days
Optional Attributes
Part Number |
---|
HDISLS010N |
HDISLS010O |
HDISLS012N |
HDISLS012O |
HDISLS012P |
HDISLS014O |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | Nominal | Pitch, Number of Threading (mm) | Overall Length (L) (mm) | Class | Thread Length (mm) | Length under neck (mm) | Shank diameter (Ds) (mm) | Number of Grooves | Shape |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
66.42 € | 1 | 8 Days | M10 | 1.25 | 75 | P4 | 24 | - | 10 | 3 | m | ||
66.42 € | 1 | Available | 8 Days | M10 | 1.5 | 75 | P4 | 24 | - | 10 | 3 | m | |
94.68 € | 1 | Available | 8 Days | M12 | 1.25 | 82 | P4 | 29 | - | 12 | 3 | m | |
94.68 € | 1 | Available | 8 Days | M12 | 1.5 | 82 | P4 | 29 | - | 12 | 3 | m | |
94.68 € | 1 | 8 Days | M12 | 1.75 | 82 | P4 | 29 | - | 12 | 3 | m | ||
129.35 € | 1 | 8 Days | M14 | 1.5 | 88 | P4 | 30 | - | 12 | 3 | m |