Manufacturer part number: SP-LMR8-150-250-MT1
Brand: TAIYO-TOOL
Price: 291.27 €
Delivery time: 6 Days
External diameter φD: 8 mm
Blade Length: 150 mm
Handle No.: MT1
Overall Length: 250 mm
Handle length: 65.5 mm
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
SP-LMR8-150-250-MT1
Part Number
|
---|
SP-LMR8-150-250-MT1 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | External diameter φD (mm) | Blade Length (mm) | Handle No. | Overall Length (mm) | Handle length (mm) | Number of flutes | Grip length (mm) | |
---|---|---|---|---|---|---|---|---|---|---|---|
291.27 € | 1 | 6 Days | 8 | 150 | MT1 | 250 | 65.5 | 6 | 1 |
Loading...
Shank Type | Morse Taper Shank | Coating Y/N | N/A | Groove Shape | Spiral |
---|---|---|---|---|---|
Base Blade Y/N | N/A |
This page is Spiral Blade Long Machine Reamer SP-LMR (SKH51), part number SP-LMR8-150-250-MT1.
You can find the detail information about specifications and dimensions on part number SP-LMR8-150-250-MT1.
Configure
Basic Attributes
Type
External diameter φD(mm)
Blade Length(mm)
Handle No.
Overall Length(mm)
Handle length(mm)
Number of flutes
Grip length(mm)
Filter by standard shipping days
Optional Attributes
Part Number |
---|
SP-LMR10-160-250-MT1 |
SP-LMR10-200-300-MT1 |
SP-LMR10-200-350-MT1 |
SP-LMR8.5-150-250-MT1 |
SP-LMR9-160-250-MT1 |
SP-LMR9.5-160-250-MT1 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | External diameter φD (mm) | Blade Length (mm) | Handle No. | Overall Length (mm) | Handle length (mm) | Number of flutes | Grip length (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|
298.22 € | 1 | 6 Days | 10 | 160 | MT1 | 250 | 65.5 | 6 | 1 | ||
380.96 € | 1 | 6 Days | 10 | 200 | MT1 | 300 | 65.5 | 6 | 1 | ||
435.20 € | 1 | 6 Days | 10 | 200 | MT1 | 350 | 65.5 | 6 | 1 | ||
311.44 € | 1 | 6 Days | 8.5 | 150 | MT1 | 250 | 65.5 | 6 | 1 | ||
311.44 € | 1 | 6 Days | 9 | 160 | MT1 | 250 | 65.5 | 6 | 1 | ||
311.44 € | 1 | 6 Days | 9.5 | 160 | MT1 | 250 | 65.5 | 6 | 1 |