Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | Holding Range | Applicable Arbor | Collet width | Details Type | Note | |
---|---|---|---|---|---|---|---|---|---|
537.55 € | 1 | 10 Days | 12.70~12.95 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 12.96~13.20 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 13.21~13.49 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 13.50~13.74 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 13.75~14.00 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 14.01~14.27 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 14.28~14.53 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 6 Days | 14.54~14.78 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 14.79~15.04 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 15.05~15.32 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 15.33~15.57 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 15.58~15.85 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 15.86~16.10 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 16.11~16.38 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 16.39~16.64 | AC8100、AC7100-A | 15.0 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 15.06~15.32 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 15.33~15.57 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 15.58~15.85 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 15.86~16.10 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 16.11~16.38 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 16.39~16.64 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 16.65~16.92 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 16.93~17.17 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 17.18~17.45 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 17.46~17.70 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 17.71~17.96 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 17.97~18.21 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 18.22~18.47 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 18.48~18.72 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 18.73~18.97 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 18.98~19.23 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 19.24~19.48 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 19.49~19.74 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 19.75~20.00 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 20.01~20.24 | AC8200、AC7200-A | 18.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 18.24~18.47 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 18.48~18.72 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 18.73~18.97 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 18.98~19.23 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 19.24~19.48 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 19.49~19.74 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 19.75~20.00 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 20.01~20.24 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 20.25~20.50 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 20.51~20.75 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 20.76~21.01 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 21.02~21.26 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 21.27~21.51 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 21.52~21.74 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 21.75~22.00 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 22.01~22.20 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | - | ||
468.01 € | 1 | 10 Days | 22.21~22.45 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 22.46~22.73 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 22.74~22.99 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 23.00~23.27 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 23.28~23.52 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 23.53~23.78 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 23.79~24.05 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 24.06~24.33 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. | ||
468.01 € | 1 | 10 Days | 24.34~24.59 | AC8300、AC7300-A | 21.3 | For Light Cutting and Grinding Work Only | A collet in the overlap range. If possible, use a collet one rank higher. |
Loading...
Type | Lathe Chuck |
---|
Configure
Basic Attributes
Holding Range
Applicable Arbor
Collet width
Details Type
Type
Filter by standard shipping days
Optional Attributes