Shipping Days |
|
---|
?* Information on days to ship and prices
MANYO TOOLS
Starting from∗ : | 164.82 € |
---|---|
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
MANYO TOOLS
Starting from∗ : | 173.22 € |
---|---|
Min. Shipping Days : | 10 Days |
*Unit price with basic configuration
MANYO TOOLS
Starting from∗ : | 353.85 € |
---|---|
Min. Shipping Days : | 10 Days |
*Unit price with basic configuration
Brand |
---|
Product Series |
Starting from∗ |
Min. Shipping Days : |
Product Category |
Applicable Manufacturing Machinery (main unit) |
Spindle types |
HSK type |
Tool Type |
Retainable blade diameter(mm) |
Chuck Type |
Holder Length L(mm) |
Maximum Allowable Rotational Speed(min-1) |
Coolant System |
Brand | MANYO TOOLS | MANYO TOOLS | MANYO TOOLS |
---|---|---|---|
Product Series | |||
Starting from∗ | 164.82 € *Unit price with basic configuration | 173.22 € *Unit price with basic configuration | 353.85 € *Unit price with basic configuration |
Min. Shipping Days : | 8 Days | 10 Days | 10 Days |
Product Category | Main Body | Main Body | Main Body |
Applicable Manufacturing Machinery (main unit) | Machining Centers | Machining Centers | Machining Centers |
Spindle types | BT40 | BT40 | BT40 |
HSK type | - | - | - |
Tool Type | End Mill / Drill | End Mill | End Mill / Tap |
Retainable blade diameter(mm) | - | - | - |
Chuck Type | - | - | - |
Holder Length L(mm) | - | - | - |
Maximum Allowable Rotational Speed(min-1) | - | - | - |
Coolant System | Center Through (Blade Through) | - | - |
Loading...