Shipping Days |
|
---|
?* Information on days to ship and prices
TOYO VALVE
Starting from∗ : | 29.21 € |
---|---|
Min. Shipping Days : | 6 Days |
*Unit price with basic configuration
TOYO VALVE
Starting from∗ : | 33.88 € |
---|---|
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
TOYO VALVE
Starting from∗ : | 83.13 € |
---|---|
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
TOYO VALVE
Starting from∗ : | 49.81 € |
---|---|
Min. Shipping Days : | 7 Days |
*Unit price with basic configuration
TOYO VALVE
Starting from∗ : | 82.36 € |
---|---|
Min. Shipping Days : | 6 Days |
*Unit price with basic configuration
Brand |
---|
Product Series |
CAD |
Starting from∗ |
Min. Shipping Days : |
Type |
Applicable Fluid |
Nominal Pressure |
Body Material |
Supply Side, Connection Type |
Supply Side, Plumbing Thread Nominal |
Supply Side, Tube Flange Nominal |
Control Side, Connection Type |
Control Side, Plumbing Thread Nominal |
Control Side, Tube Flange Nominal |
Max. Operating Pressure(MPa) |
Cracking Pressure(MPa) |
Brand | TOYO VALVE | TOYO VALVE | TOYO VALVE | TOYO VALVE | TOYO VALVE |
---|---|---|---|---|---|
Product Series | J10K Lead Free Bronze Screw Down Swing Check Valve (Metal Sheet) (JIS B 2011) < | ||||
CAD |
|
|
|
|
|
Starting from∗ | 29.21 € *Unit price with basic configuration Volume Discount | 33.88 € *Unit price with basic configuration | 83.13 € *Unit price with basic configuration | 49.81 € *Unit price with basic configuration | 82.36 € *Unit price with basic configuration |
Min. Shipping Days : | 6 Days | 8 Days | 8 Days | 7 Days | 6 Days |
Type | Swing Type | Lift Type | Lift Type | Swing Type | Swing Type |
Applicable Fluid | Water / Others | Water / Others | Water / Air / Oil / Gas | Water | Water / Air / Oil / Gas / Others |
Nominal Pressure | 125 | 150 | 16K | 10K | 10K |
Body Material | Bronze | Bronze | Ductile Cast Iron | Lead-free Copper Alloy | Stainless Steel |
Supply Side, Connection Type | Rc (R) | Rc (R) | Rc (R) | Rc (R) | Rc (R) |
Supply Side, Plumbing Thread Nominal | 1B ~ 3/8B | 1B ~ 3/8B | 1B ~ 3/4B | 1B ~ 3/4B | 1B ~ 3/4B |
Supply Side, Tube Flange Nominal | - | - | - | - | - |
Control Side, Connection Type | Rc (R) | Rc (R) | Rc (R) | Rc (R) | Rc (R) |
Control Side, Plumbing Thread Nominal | 1B ~ 3/8B | 1B ~ 3/8B | 1B ~ 3/4B | 1B ~ 3/4B | 1B ~ 3/4B |
Control Side, Tube Flange Nominal | - | - | - | - | - |
Max. Operating Pressure(MPa) | 1.2 | 1.6 | 2.2 | 1.4 | 1 |
Cracking Pressure(MPa) | - | - | - | - | - |
Loading...